# HYDROGEL-CARRIER-001 — execution prerequisites **Status:** Approved plan; prerequisites not confirmed as owned, assembled, or qualified This checklist prevents the approved hydrogel screen from appearing executable solely because chemical materials are available. It does not change the formulation, test sequence, or acceptance gates in `NanoArc_Hydrogel_Electrolyte_Carrier_Screen_Rev0.md`. ## Required before any coupon is prepared | Prerequisite | Required condition | Current record | Status | |---|---|---|---| | Coupon mould | Measured mould, nominal 20 mm diameter × 3 mm depth | Not recorded as owned | Not confirmed | | Dimensional measurement | Vernier caliper or equivalent, with resolution recorded | Not recorded as owned | Not confirmed | | Fixed-stop fixture | Compression/impedance fixture with recorded stops and safe wet handling | Not built or qualified | Not ready | | Identical electrodes | Two matching stainless-steel electrodes with documented active diameter and condition | Not recorded as owned | Not confirmed | | Test mass | Documented 100 g mass with source/nominal value recorded | Not recorded as owned | Not confirmed | The existing LC1020E, scale, glassware, hotplate, and temperature probe do not by themselves satisfy these fixture prerequisites. Printed parts may serve only as cold, noncritical templates or guards as bounded by the approved plan. ## Evidence required before execution status changes Record photographs, dimensions, material/part identity, fixture stop settings, electrode cleaning method, and the test-mass source in the hydrogel evidence directory. A prerequisite becomes **Ready** only after it is physically present and its stated condition is documented. Until then the programme remains **materials not procured or tested**. See `../LAB_EQUIPMENT_INVENTORY.md` for owned-equipment limits and `../LAB_EQUIPMENT_UPGRADE_QUEUE.md` for purchase/validation triggers.